Hi All,
I performed Stack Upgrade in Portal. After upgrade, I was not able to run reports connection error to BW message server was occurring. If I logged on BW from SAP GUI, then try this portal to run a report, it worked. But if I was not on BWQ, then portal was throwing error connecting to BW. In this situation, I thought it could be UME, checked UME parameters and changes UME master system to SAP_BW. I tried to restart Portal. jcontrol.exe stopped. exit code 66. Looked that these errors occurred, DB connection error, class load error etc. I am not able to login to Visual Admin where I changed the UME parameter, not able to login to config tool. Please help ASAP. I am not sure if it has to do with upgrade yesterday or the change in UME parameter that was causing the jcontrol.exe to stop during synchronization.
Thanks,
Kavitha Rajan.