Hi Team,
We are doing the new system build using system copy using Backup Restore Method.
While doing the post step using the SWPM we encountered the error in step 25(Run Abap Report). This step taking long time and eventually terminates with log stating the time out error.
We added the below parameter and bounce the sap and restarted the SWPM but still error is
icm/server_port_0 = PROT=HTTP,PORT=80$$
Please help to resolve the below issue. Let me know if more details is required.
Below is the error details
NFO 2015-01-16 07:20:36.581
Function module HTTP_ACTIVATE_NODE set successfully.
INFO 2015-01-16 07:20:36.605
Executing function call HTTP_ACTIVATE_NODE.
ERROR 2015-01-16 08:08:58.043
FRF-00025 Unable to call function. Error message: Time limit
- .
INFO 2015-01-16 08:08:58.044
RFC connection closed.
ERROR 2015-01-16 08:08:58.045
MUT-03025 Caught ERfcExcept in module call: Time limit exceeded..
ERROR 2015-01-16 08:08:58.95
FCO-00011 The step activateICM with step key
|NW_ABAP_OneHost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|o
nehost|0|NW_CI_Instance|ind|ind|ind|ind|ci|0|NW_CI_Instance_ABAP_Reports
|ind|ind|ind|ind|abapReports|0|activateICM was executed with status
ERROR ( Last error reported by the step: Unable to call function. Error
message: Time limit exceeded. .)
Thanks & Regards
Ravi Pandey